ROAD SURFACING 
CONTRACTORS 
Get in touch today 
 
CONTRACT: 
Wirral Docks Bridge Replacement, A554 Tower Road , Birkenhead - Surfacing and Footways 
CLIENT: 
Dawnus Construction Ltd 
SCOPE OF WORKS: 
Plane out existing surface, Machine lay 1880m2 of HRA surface course and apply pre coated chippings. Surface 914m2 of newly constructed footways. 
KEY ACHIEVEMENTS: 
Tight deadlines met proir to new bridge installation and after installation.Carriageway opened on schedule.