CONTRACT: |
Wirral Docks Bridge Replacement, A554 Tower Road , Birkenhead - Surfacing and Footways |
---|---|
CLIENT: |
Dawnus Construction Ltd |
SCOPE OF WORKS: |
Plane out existing surface, Machine lay 1880m2 of HRA surface course and apply pre coated chippings. Surface 914m2 of newly constructed footways. |
KEY ACHIEVEMENTS: |
Tight deadlines met proir to new bridge installation and after installation.Carriageway opened on schedule. |